|
4" Monorail System
|
 |
|
(Click to enlarge image) |
 |
- System in operation since May 2002
- Ten-stage zinc phosphate pretreatment system utilizes both a spray and immersion stage
- 18,000 gallon e-coat paint tank (PPG 590)
- Two-stage spray and immersion post rinse
- Two-zone curing oven
- Maximum part (window) size which can be processed: 72" hight x 30" wide x 48" D.O.T.
|
 |
|
Proactive Cost Saving
Services
|
| Basket/Bulk
Processing |
| Assembly
Work |
| Trucking
Service |
| Direct
Shipment to OEM's |
Detail
Packaging Services
|
|
Pre-rack Modular System |
| Reduces
labor cost |
| Eliminates
transportation damage of paint finish |
Eliminates
parts damage (i.e. bending, paint finish damage)
|
|
Off-line Racking System |
| Designed
specifically for very small parts (i.e. dime size) |
| Significantly
reduces/eliminates inventory loss |
| Higher
production efficiency with reduced labor versus conventional racking
methods |