March Coatings Plant 1
E-Coat Services
Programmable Hoist System
(Click to enlarge images)
System in operation since 1994
Fourteen-stage zinc phosphate immersion system
3,800 gallon E-coat paint tank (PPG 590)
Three-stage spray/immersion post-rinse
Two-zone curing oven
Maximum part (window) size which can be processed is 11' long x 3' wide x 6' high - including class "A" sheet metal
Proactive Cost Saving Services
Basket/Bulk Processing
Assembly Work
Trucking Service
Direct Shipment to OEM's
Detail Packaging Services
Pre-rack Modular System
Reduces labor cost
Eliminates transportation damage of paint finish
Eliminates parts damage (i.e. bending, paint finish damage)
Off-line Racking System
Designed specifically for very small parts (i.e. dime size)
Significantly reduces/eliminates inventory loss
Higher production efficiency with reduced labor versus conventional racking methods